Design of Testing E-Form and Reminder of Calibration Schedule for Operation Facility Testing Equipment
- DOI
- 10.2991/978-94-6463-384-9_25How to use a DOI?
- Keywords
- Website E-Form; Reminder; Visual Studio Code
- Abstract
Infrastructure testing is carried out to ensure that railway infrastructure such as operating facilities, lines, and buildings can meet safety, technical and operational feasibility, and reliability standards in accordance with the regulations that have been made. This final project discusses the creation of a testing e-form website and a testing tool calibration schedule reminder. This aims to help shorten and maximise the work of testers, assistant testers, and tool PIC whose jobs are also responsible as assistant testers, so that test result data is not lost and data can be submitted in real time according to field conditions. It is also hoped that the testing tool will not experience delays in calibration so that the tool can be monitored for its condition so as to produce accurate measurement results. This online website development uses the RAD method. The database design uses MySQL on PhpMyAdmin while the website user interface programming is prepared using Visual Studio Code. The reminder utilises the fonnte platform to connect the website with WhatsApp. Function testing on the website is carried out using the Blackbox testing method while user satisfaction testing is analysed using the ServQual method. From testing the website with these tests, it can be seen that the website made is in accordance with the design. All navigation buttons made have functioned according to their functions, and the e-form can be used and filled in the field using the internet network. Furthermore, for reminders that have been done several times, the website successfully sends reminder notifications via whatsapp 2 days before the calibration deadline.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Belqis Priya Nanda Dewi AU - Agustinus Edy Wibowo AU - Teguh Arifianto PY - 2024 DA - 2024/02/20 TI - Design of Testing E-Form and Reminder of Calibration Schedule for Operation Facility Testing Equipment BT - Proceedings of the 2nd International Conference on Railway and Transportation 2023 (ICORT 2023) PB - Atlantis Press SP - 282 EP - 299 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-384-9_25 DO - 10.2991/978-94-6463-384-9_25 ID - Dewi2024 ER -