Risk Management of Box Culvert Construction Work at Bh 1149 Cross Cirebon - Kroya with Failure Mode and Effect Analysis and Fault Tree Analysis Method
- DOI
- 10.2991/978-94-6463-384-9_13How to use a DOI?
- Keywords
- Risk Management; Failure Mode and Effect Analysis (FMEA); Fault Tree Analysis (FTA); Occupational Health and Safety (OHS); Box Culvert
- Abstract
One of the efforts made by the government in improving the quality of infrastructure is the replacement of armco to box culvert at BH 1149 between Linggapura Station - Bumiayu Station on the Cirebon - Kroya crossing. The purpose of this study is to determine the potential risks that exist during the construction process. The analysis was carried out using the Failure Mode and Effect Analysis (FMEA) and Fault Tree Analysis (FTA) methods to determine the causal factors of the risk occurrence by depicting the failure tree. The results of this analysis showed that there were 67 risk variables from the construction project and obtained the 6 highest risk variables from each work group namely slings cut off in material procurement work with an RPN value of 86,838, excavator rolled over in preparation work with a value of 82,811, heavy equipment damage in railroad bridge work with an RPN value of 83,741, punctured/scratched/tripped on box culvert work with an RPN value of 70,272, slipped on track work with an RPN value of 12,938, mired in retaining wall work with an RPN value of 55,594. In handling and preventing potential work accidents, the role of contractors and workers is very influential in reducing the number of incidents. Contractors can conduct regular evaluations of risk control and workers are required to comply with existing regulations regarding Occupational Health and Safety. Thus, a safe and comfortable workplace for workers will be obtained.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Puspita Dewi AU - Septiana Widi Astuti AU - Elvina Royani Tiana Putri PY - 2024 DA - 2024/02/20 TI - Risk Management of Box Culvert Construction Work at Bh 1149 Cross Cirebon - Kroya with Failure Mode and Effect Analysis and Fault Tree Analysis Method BT - Proceedings of the 2nd International Conference on Railway and Transportation 2023 (ICORT 2023) PB - Atlantis Press SP - 139 EP - 153 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-384-9_13 DO - 10.2991/978-94-6463-384-9_13 ID - Dewi2024 ER -