Proceedings of the 2022 3rd International Conference on Management Science and Engineering Management (ICMSEM 2022)

Evolution and Insight of Project Management Mechanism of Geological Survey in China

Authors
Xiang Wei1, Jianli Qian2, 3, Cheng Ma1, *, Weiwei Cao4, Xiuqi Yin1
1Development Research Center, China Geological Survey, Beijing, 100037, China
2Xi’an Mineral Resources Survey Center, China Geological Survey, Xi’an, 710000, Shaanxi, China
3School of Environment, China University of Geosciences (Wuhan), Wuhan, 430074, Hubei, China
4Urumqi Natural Resources Comprehensive Survey Center, Urumqi, 830026, Xinjiang, China
*Corresponding author. Email: 32210591@qq.com
Corresponding Author
Cheng Ma
Available Online 15 December 2022.
DOI
10.2991/978-94-6463-038-1_18How to use a DOI?
Keywords
Geological survey project; management system; evolution history; information technology tools
Abstract

Since the founding of New China, geological work has been highly valued by the Party and the State, with remarkable achievements in geological exploration and scientific research, and has made important contributions to economic and social development. Geological survey project management system also with the national economic system, management policies continue to adjust changes in the corresponding evolution. This paper elaborates the evolution of the geological survey project management system, reviews the relevant geological survey project management documents, and sorts out and analyzes the shortcomings of geological survey project management. On this basis, four suggestions are made to improve and optimize geological survey project management, with a view to providing theoretical guidance and reference for the improvement of geological survey project management system.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2022 3rd International Conference on Management Science and Engineering Management (ICMSEM 2022)
Series
Atlantis Highlights in Engineering
Publication Date
15 December 2022
ISBN
978-94-6463-038-1
ISSN
2589-4943
DOI
10.2991/978-94-6463-038-1_18How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Xiang Wei
AU  - Jianli Qian
AU  - Cheng Ma
AU  - Weiwei Cao
AU  - Xiuqi Yin
PY  - 2022
DA  - 2022/12/15
TI  - Evolution and Insight of Project Management Mechanism of Geological Survey in China
BT  - Proceedings of the 2022 3rd International Conference on Management Science and Engineering Management (ICMSEM 2022)
PB  - Atlantis Press
SP  - 173
EP  - 183
SN  - 2589-4943
UR  - https://doi.org/10.2991/978-94-6463-038-1_18
DO  - 10.2991/978-94-6463-038-1_18
ID  - Wei2022
ER  -