Instructional Design and Training of Typical Simulation Project-- water supply and monitoring system
- DOI
- 10.2991/icetis-13.2013.25How to use a DOI?
- Keywords
- Typical simulation project; Water supply equipment installation; Connections; monitoring;Operation adjustment
- Abstract
In order to foster students’ ability of analyzing and solve problems and improve their practical ability, we designed a comprehensive practical instructional simulation which helps the students to have a clear understanding of water supply and monitoring theory based on the curriculum. This simulation combines the water supply project and its monitoring system tightly. The students should be able to complete the installation and adjustment of the simulation after finishing the related courses such as " water supply and drainage engineering ", " electric control ", " pipe installation process ", " electric construction technology " and the installation of pipelines. Among the numerous ways of water supply, the combination of pool, water tank and pump is widely used. So we choose this typical combination as our simulation course. The main function of monitoring is to control the pump by computer to optimize the system and fulfill a high-efficient but economic operation. The water level in the tank and the pump status are the key parts to be monitored.
- Copyright
- © 2013, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yafeng Zhang PY - 2013/06 DA - 2013/06 TI - Instructional Design and Training of Typical Simulation Project-- water supply and monitoring system BT - Proceedings of the 2013 the International Conference on Education Technology and Information System (ICETIS 2013) PB - Atlantis Press SP - 108 EP - 112 SN - 1951-6851 UR - https://doi.org/10.2991/icetis-13.2013.25 DO - 10.2991/icetis-13.2013.25 ID - Zhang2013/06 ER -