Whole-process Cost Management of Green Building Projects
- DOI
- 10.2991/978-94-6463-502-7_113How to use a DOI?
- Keywords
- Green building; whole-process cost management; entropy weight method; fuzzy evaluation method
- Abstract
Carrying out full-process management of green building projects is of positive significance to effectively control project costs and help enterprises improve economic benefits. The article studies this. First, a scientific and accurate index evaluation system is established to evaluate cost management from the five stages of decision-making, design, bidding, construction, and completion. Secondly, the entropy weight method and fuzzy evaluation method are used to evaluate, and finally based on examples, obtain the evaluation results of the evaluation system and perform corresponding analysis to prove the accuracy of the proposed evaluation system and provide a reference for the national cost management of green building engineering projects.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Ting Fang PY - 2024 DA - 2024/08/31 TI - Whole-process Cost Management of Green Building Projects BT - Proceedings of the 2024 5th International Conference on Education, Knowledge and Information Management (ICEKIM 2024) PB - Atlantis Press SP - 1061 EP - 1068 SN - 2589-4900 UR - https://doi.org/10.2991/978-94-6463-502-7_113 DO - 10.2991/978-94-6463-502-7_113 ID - Fang2024 ER -