Recognition of Additional Investment in the Power Grid During the Verification of Transmission and Distribution Electricity Prices

Authors
Anli Sun1, Guoquan Wang1, *, Songsong Liu1, Dan Zhao1
1State Grid Chongqing Electric Power Co., Ltd., Economic and Technological Research Institute, Chongqing, China
*Corresponding author. Email: kinox2016@126.com
Corresponding Author
Guoquan Wang
Available Online 28 February 2025.
DOI
10.2991/978-94-6463-656-7_26How to use a DOI?
Keywords
Transmission and distribution electricity prices; new power systems; new investment recognition; major national policy investments; electricity market reform
Abstract

To further promote the healthy development of the power industry and assist in achieving the goals of “carbon peak and carbon neutrality”, it is necessary to accelerate the construction of a new type of power system. In order to better adapt to the new changes brought about by the construction of the new power system to the investment and construction of the power grid, improve the working system for the reporting and recognition of new investments and predicted electricity in the determination of transmission and distribution electricity prices, and enhance the standardization of the determination of transmission and distribution electricity prices, this paper studies and analyzes the impact of the construction of the new power system on the determination of transmission and distribution electricity prices. Based on the needs of the determination of transmission and distribution electricity prices, combined with the requirements of power system planning and investment management of power grid enterprises, a framework and standards for the recognition of new investments in the determination of transmission and distribution electricity prices are proposed.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of 2024 4th International Conference on Public Management and Big Data Analysis (PMBDA 2024)
Series
Advances in Economics, Business and Management Research
Publication Date
28 February 2025
ISBN
978-94-6463-656-7
ISSN
2352-5428
DOI
10.2991/978-94-6463-656-7_26How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Anli Sun
AU  - Guoquan Wang
AU  - Songsong Liu
AU  - Dan Zhao
PY  - 2025
DA  - 2025/02/28
TI  - Recognition of Additional Investment in the Power Grid During the Verification of Transmission and Distribution Electricity Prices
BT  - Proceedings of 2024 4th International Conference on Public Management and Big Data Analysis (PMBDA 2024)
PB  - Atlantis Press
SP  - 257
EP  - 265
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-656-7_26
DO  - 10.2991/978-94-6463-656-7_26
ID  - Sun2025
ER  -