A Two-Layer Electric Energy Substitute Planning Model with the Rationality of Regional and Annual Target
- DOI
- 10.2991/mmssa-18.2019.20How to use a DOI?
- Keywords
- two-layer; planning model; electric energy substitute; provincial planning
- Abstract
There are some problems in the planning of electric energy substitution, such as the disconnection between headquarters planning and provincial planning, the disconnection between provincial planning and the unscientific measurement. To release them, a two-layer planning model is proposed, with which the headquarter has less restrictions on the time and the goal of promoting electric energy substitution in each province, and has given full play to the enthusiasm of promoting electric energy substitution in each province. Moreover, electric energy substitution planning in all provinces of the country is linked with each other. The planning has an overall perspective and forms an overall systematic strategic plan. Headquarter and provincial make plans for electric energy substitution scientifically by taking into account the cost of electrical energy, air pollution, as well as the relevant government planning in each region. Additionally, the model can also be used for the planning of other business of Grid Company after simple modification.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yu Zhang AU - Yuan Xiao AU - Shaoyun Hong AU - Guilin Huang AU - Chaoxiong Fang AU - Yi Lin AU - Ke Xiong PY - 2019/01 DA - 2019/01 TI - A Two-Layer Electric Energy Substitute Planning Model with the Rationality of Regional and Annual Target BT - Proceedings of the 2018 International Conference on Mathematics, Modeling, Simulation and Statistics Application (MMSSA 2018) PB - Atlantis Press SP - 86 EP - 89 SN - 1951-6851 UR - https://doi.org/10.2991/mmssa-18.2019.20 DO - 10.2991/mmssa-18.2019.20 ID - Zhang2019/01 ER -