Condition Assessment of A 360MW Turbine
Authors
Li Chongsheng, Bu Jianwei
Corresponding Author
Li Chongsheng
Available Online December 2012.
- DOI
- 10.2991/mems.2012.167How to use a DOI?
- Keywords
- turbine state assessment, risk assessment, maintenance period optimization
- Abstract
An opening HIP (high and intermediate pressure) casing overhaul of a 360MW turbine should be taken in 2012 on schedule. And this kind of overhaul wasn’t taken on the turbine during the past 12 years from startup. But the overhaul needs to be delayed for some reasons. A comprehensive condition assessment of the turbine is taken. By the full investigation, calculation and assessment, the actual condition of the turbine is obtained. According to the result of the comprehensive assessment, the overhaul is delayed and a considerable benefit is brought to the owner.
- Copyright
- © 2012, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Li Chongsheng AU - Bu Jianwei PY - 2012/12 DA - 2012/12 TI - Condition Assessment of A 360MW Turbine BT - Proceedings of the 1st International Conference on Mechanical Engineering and Material Science (MEMS 2012) PB - Atlantis Press SP - 637 EP - 640 SN - 1951-6851 UR - https://doi.org/10.2991/mems.2012.167 DO - 10.2991/mems.2012.167 ID - Chongsheng2012/12 ER -