Numerical Simulation on Top-down Construction Method of Subway Station in Hefei
- DOI
- 10.2991/lemcs-15.2015.348How to use a DOI?
- Keywords
- Top-down construction method; Midas; Ground settlement; Retaining structure; Deformation
- Abstract
The top-down construction method has complex construction organization and many courses. Whether on theory or practice, quite a lot of problems need to be solved. In this paper, researchers used the finite element program Midas GTS to simulate THE foundation pit excavation of subway station in Hefei which used top-down construction method. The purpose is to research the regulation of the ground settlement and deformation of retaining structure. According to the theoretical data, researchers can know what time and where the maximum of the horizontal deformation of retaining structure and ground settlement may appear. Researchers may predict the risk and take measures to prevent accidents. All of it will provide the theoretical data to serve engineering practice.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Kewei Ding AU - Naiyang Guo PY - 2015/07 DA - 2015/07 TI - Numerical Simulation on Top-down Construction Method of Subway Station in Hefei BT - Proceedings of the International Conference on Logistics, Engineering, Management and Computer Science PB - Atlantis Press SP - 1717 EP - 1720 SN - 1951-6851 UR - https://doi.org/10.2991/lemcs-15.2015.348 DO - 10.2991/lemcs-15.2015.348 ID - Ding2015/07 ER -