Research on the Prediction of Second Synchronization in Timing System using Cubic Exponential Smoothing
Authors
Haidong Zou, Zeshui Liu, Yewei Yang, Jingbo Zhang
Corresponding Author
Haidong Zou
Available Online July 2015.
- DOI
- 10.2991/lemcs-15.2015.239How to use a DOI?
- Keywords
- Rubidium clock;Global Position System; Frequency drift; Time series prediction; Smoothing coefficient
- Abstract
The value of time synchronization between Rubidium clock and GPS clock, which changing with time, was studied by using the time series prediction method. Some issues such as the selection of the smoothing coefficient and the prediction accuracy problem of linear exponential smoothing, secondary exponential smoothing and cubic exponential smoothing were discussed in this paper. The results showed that the mean absolute error of prediction was minimum if smoothing coefficient equaled to 0.5, and the result of cubic exponential smoothing prediction coincided preferably to the measure values.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Haidong Zou AU - Zeshui Liu AU - Yewei Yang AU - Jingbo Zhang PY - 2015/07 DA - 2015/07 TI - Research on the Prediction of Second Synchronization in Timing System using Cubic Exponential Smoothing BT - Proceedings of the International Conference on Logistics, Engineering, Management and Computer Science PB - Atlantis Press SP - 1199 EP - 1202 SN - 1951-6851 UR - https://doi.org/10.2991/lemcs-15.2015.239 DO - 10.2991/lemcs-15.2015.239 ID - Zou2015/07 ER -