Proceedings of the 2023 7th International Seminar on Education, Management and Social Sciences (ISEMSS 2023)

Dynamic Scheduling Study of Flexible Job Shop Considering Machine Failure Rate

Authors
Wenmin Han1, *, Zhuoya Feng1, Jiahui Cai1
1Institute of Economics and Management, Jiangsu University of Science and Technology, Zhenjiang, Jiangsu, China
*Corresponding author. Email: wlmh63@163.com
Corresponding Author
Wenmin Han
Available Online 31 October 2023.
DOI
10.2991/978-2-38476-126-5_6How to use a DOI?
Keywords
flexible job shop; production disturbance; rescheduling; MOABC
Abstract

For the flexible job shop dynamic scheduling problem, set machine priorities based on machine failure rates, a scheduling model with the objective of minimizing the maximum completion time and machine load balance ratio is established, and an improved ABC algorithm is designed to solve it. An external solution set is introduced in the iterative optimization stage of the algorithm to realize the solution of the ABC algorithm for multiple objectives. The effectiveness of the optimal scheduling algorithm is verified by the classical flexible job shop scheduling problem.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2023 7th International Seminar on Education, Management and Social Sciences (ISEMSS 2023)
Series
Advances in Social Science, Education and Humanities Research
Publication Date
31 October 2023
ISBN
978-2-38476-126-5
ISSN
2352-5398
DOI
10.2991/978-2-38476-126-5_6How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Wenmin Han
AU  - Zhuoya Feng
AU  - Jiahui Cai
PY  - 2023
DA  - 2023/10/31
TI  - Dynamic Scheduling Study of Flexible Job Shop Considering Machine Failure Rate
BT  - Proceedings of the 2023 7th International Seminar on Education, Management and Social Sciences (ISEMSS 2023)
PB  - Atlantis Press
SP  - 42
EP  - 47
SN  - 2352-5398
UR  - https://doi.org/10.2991/978-2-38476-126-5_6
DO  - 10.2991/978-2-38476-126-5_6
ID  - Han2023
ER  -