Discussion on traffic capacity and speed limit in work zone on highway
Authors
N.c. Huang, Ping Wang
Corresponding Author
N.c. Huang
Available Online September 2015.
- DOI
- 10.2991/ifeesm-15.2015.258How to use a DOI?
- Keywords
- Highway, Work zone, Micro-simulation, Traffic capacity, Speed control
- Abstract
Highway road conditions are changed largely in the reconstruction compared to normal operation, with traffic capacity falling down due to lane closures changing lanes frequently caused by merging compulsory, and more accidents resulting from vehicle conflict. Based on VISSIM simulation software, this paper typically studied the most common way of construction, that two-way four-lane, close for single lane analyzed the effect on the traffic capacity of the work zone in different conditions, and proposed reasonable speed limit option for the security of the work zone.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - N.c. Huang AU - Ping Wang PY - 2015/09 DA - 2015/09 TI - Discussion on traffic capacity and speed limit in work zone on highway BT - Proceedings of the 2015 International Forum on Energy, Environment Science and Materials PB - Atlantis Press SP - 1422 EP - 1427 SN - 2352-5401 UR - https://doi.org/10.2991/ifeesm-15.2015.258 DO - 10.2991/ifeesm-15.2015.258 ID - Huang2015/09 ER -