Audit Current Situation Analysis and Countermeasure Research of Electric Power Construction Project
- DOI
- 10.2991/iemss-17.2017.155How to use a DOI?
- Keywords
- Integrated project, Project audit, Evaluation model, Necessity evaluation, Input-output analysis.
- Abstract
Electric power construction project planning audit is carrying out before the release of the project reserves and the plans. It belongs to the audit checks between the project approval and implementation. It is also the premise and the key of the project that can be carried out smoothly and effectively. On the basis of summarizing the present situation of the project planning audit, this paper analyzes the existing problems of the planning audit in power construction projects. In this paper, a planning audit model of electric power construction project will help electrical enterprises to solve these problems, to provide evaluation basis for the audit and supports for the business and techniques. The plan audit model contains four parts: necessity planning review, input-output analysis, the evaluation of data integrity and the evaluation of process compliance.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Quan Tang AU - Quanming Zhang AU - KaiJiang Cao AU - Yi Luo AU - Zhichao Ren AU - HongLing Yin AU - Rundong Chen AU - Zhenxing Hao AU - Yan Wang AU - Hanyu Chen PY - 2017/04 DA - 2017/04 TI - Audit Current Situation Analysis and Countermeasure Research of Electric Power Construction Project BT - Proceedings of the 2017 International Conference on Innovations in Economic Management and Social Science (IEMSS 2017) PB - Atlantis Press SP - 797 EP - 800 SN - 2352-5428 UR - https://doi.org/10.2991/iemss-17.2017.155 DO - 10.2991/iemss-17.2017.155 ID - Tang2017/04 ER -