Proceedings of the 2024 6th International Conference on Structural Seismic and Civil Engineering Research (ICSSCER 2024)

Research on the Treatment Plan for Anchor Ropes in the Construction of Subway Bored Pile

Authors
Shuanding Liu1, *, Jinchang Zhang1, Bo Zhang1, Zengxin Li1
1CCCC Third Engineering Co., Ltd., Beijing, 101102, China
*Corresponding author. Email: 664830889@qq.com
Corresponding Author
Shuanding Liu
Available Online 29 October 2024.
DOI
10.2991/978-94-6463-556-0_14How to use a DOI?
Keywords
subway station drilling and grouting pile anchor cable treatment plan; reference significance
Abstract

This study primarily explores treatment solutions for anchor cables encountered during the construction of subway bored piles. As pile anchor forms become prevalent in foundation pit support for high-rise buildings, the intersection of subway lines with existing anchor cable areas poses considerable challenges. The study aims to develop practical and feasible anchor cable treatment plans to facilitate efficient, economical, and safe completion of subway station and other open-cut retaining structures. Taking the Youyi South Street Station of Shijiazhuang Metro Line 4 as an example, through comparative analysis of different treatment schemes, the optimal approach is identified, providing valuable references for similar engineering projects.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2024 6th International Conference on Structural Seismic and Civil Engineering Research (ICSSCER 2024)
Series
Advances in Engineering Research
Publication Date
29 October 2024
ISBN
978-94-6463-556-0
ISSN
2352-5401
DOI
10.2991/978-94-6463-556-0_14How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Shuanding Liu
AU  - Jinchang Zhang
AU  - Bo Zhang
AU  - Zengxin Li
PY  - 2024
DA  - 2024/10/29
TI  - Research on the Treatment Plan for Anchor Ropes in the Construction of Subway Bored Pile
BT  - Proceedings of the 2024 6th International Conference on Structural Seismic and Civil Engineering Research (ICSSCER 2024)
PB  - Atlantis Press
SP  - 115
EP  - 121
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-556-0_14
DO  - 10.2991/978-94-6463-556-0_14
ID  - Liu2024
ER  -