A post-evaluation Research of Economical Effects for Power Grid Construction Project Based on ANP-Hesitate Linguistics
- DOI
- 10.2991/icmse-15.2015.49How to use a DOI?
- Keywords
- power grid construction project; economic efficiency post-appraisal; ANP-Hesitate linguistic; cloud model;
- Abstract
In electric power system reform environment, grid companies have to estimate the economic performance of power grid construction project completed with a more market-oriented perspective. Therefore, economic efficiency post-appraisal model of the power grid is proposed in this paper. In view of the problem of evaluating of economic benefits only from financial angle in existing research, lack of comprehensiveness and depth, including construction costs, financial, social and economic benefits and environmental impact costs four aspects were build as the index system with network hierarchy. On this basis, the ANP method to solve the index weight was put forward, and hesitate linguistic evaluation method for policymakers, finally cloud model assembled each index evaluation result.In the end, three power grid construction projects in liaoning province had built were used for verifying the feasibility and rationality of the model.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Liaoyi Ning AU - Liang Fan AU - Jinyuan Liu AU - Ce Xiu AU - Kaifeng Chen PY - 2015/12 DA - 2015/12 TI - A post-evaluation Research of Economical Effects for Power Grid Construction Project Based on ANP-Hesitate Linguistics BT - Proceedings of the 2015 6th International Conference on Manufacturing Science and Engineering PB - Atlantis Press SP - 256 EP - 265 SN - 2352-5401 UR - https://doi.org/10.2991/icmse-15.2015.49 DO - 10.2991/icmse-15.2015.49 ID - Ning2015/12 ER -