Research on investment model of power cable about big data
Authors
Xuyang Gong, Yanfang Kang, Xin Hu, Juan Li
Corresponding Author
Xuyang Gong
Available Online September 2017.
- DOI
- 10.2991/icmmcce-17.2017.185How to use a DOI?
- Keywords
- Big Data; Power cable; Difference fee
- Abstract
To meet power cable construction underground in the city, it is necessary to ensure the normal operation of power cable. In this paper, we do the research about the compensation mode of cable line construction in Henan province, that is the difference mode and the construction mode, and analyzed with the actual project. We get the conclusion that difference fee compare to the construction fee is increased the difference between the cable fee and overhead cost. And we analysis the reasons based on "State grid corporation on General cost of transmission and transformation engineering" and the actual engineering.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xuyang Gong AU - Yanfang Kang AU - Xin Hu AU - Juan Li PY - 2017/09 DA - 2017/09 TI - Research on investment model of power cable about big data BT - Proceedings of the 2017 5th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering (ICMMCCE 2017) PB - Atlantis Press SP - 1029 EP - 1034 SN - 2352-5401 UR - https://doi.org/10.2991/icmmcce-17.2017.185 DO - 10.2991/icmmcce-17.2017.185 ID - Gong2017/09 ER -