Research and Application of the System of Electric Power Engineering in the Huangling Mining 2 × 300MW Power Plant Construction Period
- DOI
- 10.2991/icetis-13.2013.101How to use a DOI?
- Keywords
- Power plant;Engineering Management;Schedule Management;Information Platform
- Abstract
A lot of things that need to be managed in the thermal power projects. In this process,many factors are constrained and associated each other,That all aspects of works are plan organize,coordinate, control and management Legitimately are the guarantee of success.In the process of building the Huangling Mining 2 × 300MW power plant,through the use of the electricity project management system,preparation office,supervision,design,construction,and other units gather into a platform.The major event the document marking project contract management material supply,acceptance settlement integrate information platform.Preparatory Office can control of the project's funding,schedule,quality,safety In every moment.it can easily coordinated,Controled,and managed works.
- Copyright
- © 2013, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yuping Jin PY - 2013/06 DA - 2013/06 TI - Research and Application of the System of Electric Power Engineering in the Huangling Mining 2 × 300MW Power Plant Construction Period BT - Proceedings of the 2013 the International Conference on Education Technology and Information System (ICETIS 2013) PB - Atlantis Press SP - 452 EP - 455 SN - 1951-6851 UR - https://doi.org/10.2991/icetis-13.2013.101 DO - 10.2991/icetis-13.2013.101 ID - Jin2013/06 ER -