Treatment Plans of Settlement Deformation at Expressway Tunnel Portal Area
Authors
Tang Enkuan, Likui Huang, Daiguang Chen, Qing Shen, Wenbin Wu
Corresponding Author
Tang Enkuan
Available Online September 2018.
- DOI
- 10.2991/iceep-18.2018.290How to use a DOI?
- Keywords
- tunnel portal area; settlement deformation; treatment plan; monitoring
- Abstract
This paper presents the cause analysis, treatment plans and treatment results of a settlement deformation accident at tunnel portal area of left line T1 tunnel in Algeria North-South Expressway. The engineering practice demonstrated the feasibility, timeliness, and safety of the treatment plans. The successful handling of the accident provided an important reference for the formulation of the settlement deformation treatment plans in the tunnel portal areas.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Tang Enkuan AU - Likui Huang AU - Daiguang Chen AU - Qing Shen AU - Wenbin Wu PY - 2018/09 DA - 2018/09 TI - Treatment Plans of Settlement Deformation at Expressway Tunnel Portal Area BT - Proceedings of the 2018 7th International Conference on Energy and Environmental Protection (ICEEP 2018) PB - Atlantis Press SP - 1608 EP - 1612 SN - 2352-5401 UR - https://doi.org/10.2991/iceep-18.2018.290 DO - 10.2991/iceep-18.2018.290 ID - Enkuan2018/09 ER -