Multiple targets operation of reservoir group in flood-season in the Yangtze River
- DOI
- 10.2991/iccia.2012.358How to use a DOI?
- Keywords
- multiple targets, reservoir group, reservoir operation in flood-season, the Yangtze River, scheme evaluation
- Abstract
China has built many reservoirs in the Yangtze River. Those reservoirs play an important role in flood control, electricity generation and shipping. But it is difficult to operation reservoir group reasonably because the comprehensive utilization demand. Especially in flood-season, there are usually many different targets to be considered. This paper researched the multiple targets operation of reservoir group in flood-season in the Yangtze River by multi-objective evaluation method. Three reservoir group operation schemes were selected to be compared. The results show that scheme three is the best scheme which has the highest evaluation value. The method this paper proposed is effective in comparing and selecting schemes in flood control management.
- Copyright
- © 2013, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Anqiang Li AU - Xiaocong He PY - 2014/05 DA - 2014/05 TI - Multiple targets operation of reservoir group in flood-season in the Yangtze River BT - Proceedings of the 2012 2nd International Conference on Computer and Information Application (ICCIA 2012) PB - Atlantis Press SP - 1442 EP - 1445 SN - 1951-6851 UR - https://doi.org/10.2991/iccia.2012.358 DO - 10.2991/iccia.2012.358 ID - Li2014/05 ER -