Proceedings of the 2024 8th International Conference on Civil Architecture and Structural Engineering (ICCASE 2024)

Analysis of Shield Tunneling Section between Lianhu Park and Zuchongzhilu Stations on Suzhou Metro Line 11

Authors
Xiaofeng Lu1, *
1Zhoushi Town Construction Bureau of Kunshan City, Kunshan, Jiangsu, China
*Corresponding author. Email: 173084516@qq.com
Corresponding Author
Xiaofeng Lu
Available Online 30 June 2024.
DOI
10.2991/978-94-6463-449-5_54How to use a DOI?
Keywords
Metro system; Shield Tunneling Section; analysis and evaluation; shield tunnel segments; construction monitoring
Abstract

The Suzhou Metro Line 11 is a planned urban rail transit line in Suzhou City. The efficient and safe construction of Line 11 will effectively alleviate the traffic pressure in the urban area, provide convenient and efficient public transportation options, improve traffic congestion, and enhance the convenience and efficiency of citizens’ travel. Based on the geological survey, considering the engineering geological and hydrogeological conditions of the tunnel section between Lianhu Park and Zuchongzhi Road stations on Suzhou Metro Line 11, combined with the experience of similar projects, the construction method of shield tunneling with earth pressure balance technique was determined for the tunnel section. To ensure safe and efficient construction, attention points during shield tunneling construction were also addressed. Based on the cross-sectional diagram of the shield tunnel structure, a calculation model for the segment of the shield tunnel was proposed, determining the reinforcement, reinforcement area, and reinforcement ratio for segments at different burial depths. During the specific construction process, a construction monitoring plan was established for different areas within the major impact zone, minor impact zone, and potential impact zone. Shield tunneling construction in urban environments requires meticulous monitoring to ensure construction quality, mitigate risks to the surrounding environment, and safeguard public safety. Therefore, construction monitoring data points were accordingly arranged. This paper presents an analysis of shield tunneling construction for Suzhou Metro Line 11, focusing on the geological conditions, construction methodologies, and monitoring strategies employed. Through comprehensive monitoring and analysis, the study aims to understand the dynamic changes in soil and water pressure during tunnel excavation, assess the impact of construction on surrounding structures, and optimize construction techniques and parameters. The findings provide valuable insights for future urban tunneling projects, highlighting the importance of proactive monitoring and adaptive construction strategies.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2024 8th International Conference on Civil Architecture and Structural Engineering (ICCASE 2024)
Series
Atlantis Highlights in Engineering
Publication Date
30 June 2024
ISBN
10.2991/978-94-6463-449-5_54
ISSN
2589-4943
DOI
10.2991/978-94-6463-449-5_54How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Xiaofeng Lu
PY  - 2024
DA  - 2024/06/30
TI  - Analysis of Shield Tunneling Section between Lianhu Park and Zuchongzhilu Stations on Suzhou Metro Line 11
BT  - Proceedings of the 2024 8th International Conference on Civil Architecture and Structural Engineering (ICCASE 2024)
PB  - Atlantis Press
SP  - 554
EP  - 563
SN  - 2589-4943
UR  - https://doi.org/10.2991/978-94-6463-449-5_54
DO  - 10.2991/978-94-6463-449-5_54
ID  - Lu2024
ER  -