Proceedings of the 2016 5th International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2016)

Reliability Analysis of Pre-stressed Concrete Continuous Girder Bridges using Cantilever Construction on JTG D60-2015 and AASHTO LRFD-2012

Authors
C.H. Lou, F.H. Dong
Corresponding Author
C.H. Lou
Available Online October 2016.
DOI
10.2991/iccahe-16.2016.85How to use a DOI?
Keywords
Pre-stressed concrete; Girder bridge; Cantilever construction; Service stage; Reliability index
Abstract

The object of this paper analyzes the reliability level of pre-stressed concrete continuous girder bridges designed with the Chinese codes including the code for design of highway reinforced concrete and pre-stressed concrete bridges and culverts of AASHTO LRFD-2012 and JTG D60-2015 using cantilever construction method. Typical cross-sections used in the example bridge are considered at service stage. Load and resistance parameters are treated as random variables. The statistical parameters are based on the available literature, test data and survey results. Reliability indices are calculated by iterations using the first-order second-moment method. The calculated results indicate that the reliability indices on the code of AASHTO LRFD-2012 vary considerably to the code of JTG D60-2015. And it could provide the references for the reinforcement of old bridges and the design of new bridges using the cantilever construction.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 5th International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2016)
Series
Advances in Engineering Research
Publication Date
October 2016
ISBN
978-94-6252-250-3
ISSN
2352-5401
DOI
10.2991/iccahe-16.2016.85How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - C.H. Lou
AU  - F.H. Dong
PY  - 2016/10
DA  - 2016/10
TI  - Reliability Analysis of Pre-stressed Concrete Continuous Girder Bridges using Cantilever Construction on JTG D60-2015 and AASHTO LRFD-2012
BT  - Proceedings of the 2016 5th International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2016)
PB  - Atlantis Press
SP  - 510
EP  - 513
SN  - 2352-5401
UR  - https://doi.org/10.2991/iccahe-16.2016.85
DO  - 10.2991/iccahe-16.2016.85
ID  - Lou2016/10
ER  -