Research on Scheduling Algorithm Based on Elevator Group Control System
- DOI
- 10.2991/icadme-17.2017.47How to use a DOI?
- Keywords
- Elevator group control system Multi - objective optimization algorithm Delayed Flight Algorithm
- Abstract
This paper is based on the elevator group control system scheduling algorithm research, For the current elevator running in the process of a long time ladder phenomenon analyzes the structural characteristics of the group controlled elevator system, puts forward the structural scheme of the overall design of the elevator group control system, realizes the communication between the elevator group controller and the single one, and carries on the unified coordination dispatching to the single elevator. Taking into account the elevator ladder in the process of waiting time, ladder time, energy loss and other issues, as well as different modes of traffic operation, etc., proposed to adapt to the situation of the most tactics, multi-objective optimization algorithm and delay And it is applied to the scheduling strategy of elevator group control. The scheduling algorithm is implemented by software program.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xuexia Zhang AU - An Ying Fu AU - Jinbo Zhang PY - 2017/07 DA - 2017/07 TI - Research on Scheduling Algorithm Based on Elevator Group Control System BT - Proceedings of the 2017 7th International Conference on Advanced Design and Manufacturing Engineering (ICADME 2017) PB - Atlantis Press SP - 237 EP - 243 SN - 2352-5401 UR - https://doi.org/10.2991/icadme-17.2017.47 DO - 10.2991/icadme-17.2017.47 ID - Zhang2017/07 ER -