Quality evaluation on long stopped building bridges in highway exten-sion projects
Authors
H.J Hou, K.X Xue, Q He, M.L Cui, J Yan, R.J Ou
Corresponding Author
H.J Hou
Available Online October 2015.
- DOI
- 10.2991/icadme-15.2015.244How to use a DOI?
- Keywords
- Highway extension projects; Bridges stopped building for long without maintenance; Quality eval-uation; Contrast of quality evaluation criteria; Suggestions for improvement
- Abstract
Quality evaluation of bridges stopped building for a long period in highway extension projects is not only critical to re-recognize quality (precondition for follow-up construction) but to adopt treatment measures for bridges. Nevertheless, studies on this issue are quite few at home and abroad so far. In this paper, based on the contrastive analysis of the Chinese bridge technique con-dition evaluation criteria, the quality evaluation ideas and suggestions are put forward. In the pro-cess, it’s considered the complexity of bridge engineering, far different from the new, that long stopped now to return to build.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - H.J Hou AU - K.X Xue AU - Q He AU - M.L Cui AU - J Yan AU - R.J Ou PY - 2015/10 DA - 2015/10 TI - Quality evaluation on long stopped building bridges in highway exten-sion projects BT - Proceedings of the 5th International Conference on Advanced Design and Manufacturing Engineering PB - Atlantis Press SP - 1321 EP - 1325 SN - 2352-5401 UR - https://doi.org/10.2991/icadme-15.2015.244 DO - 10.2991/icadme-15.2015.244 ID - Hou2015/10 ER -