Research on the Test Section of High Fill Embankment in Swamp Soil of the Phase I Project of the Solo Kertosono Toll Road in Indonesia
- DOI
- 10.2991/978-94-6463-336-8_45How to use a DOI?
- Keywords
- Roadbed; Soft soil; Settlement
- Abstract
This research project is based on the first phase of the toll road project from Solo to Kertosono in Indonesia, combined with a series of problems encountered during the construction process of the high-fill roadbed engineering in swampy soil. In response to key technologies during the construction process, a special study on the characteristics, bearing mechanism, and deformation law of swampy soil is carried out by using experimental sections. This article sorted out the engineering characteristics of the boundary moisture content, organic matter content, particle size, compression characteristics, and mechanical properties of the foundation soil at the project site, and analyzed the settlement law of the high-fill roadbed test section.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Ganmeng Zhang PY - 2023 DA - 2023/12/30 TI - Research on the Test Section of High Fill Embankment in Swamp Soil of the Phase I Project of the Solo Kertosono Toll Road in Indonesia BT - Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023) PB - Atlantis Press SP - 391 EP - 399 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-336-8_45 DO - 10.2991/978-94-6463-336-8_45 ID - Zhang2023 ER -