Selecting the Startup Combined-cycle Power plants Initial Steam Temperatures in Compliance with the High-Pressure Steam Superheater Outlet Headers Heating Conditions
Authors
Yuri Radin, Tatiana Kontorovich
Corresponding Author
Yuri Radin
Available Online October 2013.
- DOI
- 10.2991/iaw-sc.2013.126How to use a DOI?
- Keywords
- component; combined-cycle power plant; high-pressure steam superheater; outlet header; initial difference of steam and metal temperatures; heating rate; startup; cyclic strength; startup assignment schedule; maintenance programs; diagnostic tasks
- Abstract
This report represents heating/cooling conditions analysis of high-temperature details of the steam part equipment of combined-cycle power plants. The analysis is based on the justification of their cyclic strength by using 3D finite element models. A procedure is proposed which can be used to develop combined-cycle power plants startup assignment schedules for different initial thermal states and maintenance programs. The resulting solutions can be used to develop combined-cycle power plants diagnostic tasks.
- Copyright
- © 2013, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yuri Radin AU - Tatiana Kontorovich PY - 2013/10 DA - 2013/10 TI - Selecting the Startup Combined-cycle Power plants Initial Steam Temperatures in Compliance with the High-Pressure Steam Superheater Outlet Headers Heating Conditions BT - Proceedings of the 2013 International Academic Workshop on Social Science PB - Atlantis Press SP - 567 EP - 571 SN - 1951-6851 UR - https://doi.org/10.2991/iaw-sc.2013.126 DO - 10.2991/iaw-sc.2013.126 ID - Radin2013/10 ER -