Proceedings of the 2017 3rd International Conference on Economics, Social Science, Arts, Education and Management Engineering (ESSAEME 2017)

Construction of Cost and Schedule Equilibrium Control Model for Communication Base Stations Project

Authors
Guoqing Dang
Corresponding Author
Guoqing Dang
Available Online July 2017.
DOI
10.2991/essaeme-17.2017.458How to use a DOI?
Keywords
Cost and Schedule Equilibrium Control, Communication Base Station, Earned Value Method
Abstract

With the increasing number of project construction, the shortening of engineering period and the continuous improvement of quality requirements have promoted the advanced experience of project management in the construction of network. The construction quality of base station and the construction period of base station have become the decisive factor. This paper discusses the application of the theory and method of modern project management in the construction of telecommunication network communication network. The significance of this thesis is to find out the rational application pattern of project management in the construction of communication network so as to make the construction of communication network more scientific and scientific, so as to reduce the cost of the enterprise and improve the efficiency and competitiveness of the enterprise.

Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2017 3rd International Conference on Economics, Social Science, Arts, Education and Management Engineering (ESSAEME 2017)
Series
Advances in Social Science, Education and Humanities Research
Publication Date
July 2017
ISBN
978-94-6252-367-8
ISSN
2352-5398
DOI
10.2991/essaeme-17.2017.458How to use a DOI?
Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Guoqing Dang
PY  - 2017/07
DA  - 2017/07
TI  - Construction of Cost and Schedule Equilibrium Control Model for Communication Base Stations Project
BT  - Proceedings of the 2017 3rd International Conference on Economics, Social Science, Arts, Education and Management Engineering (ESSAEME 2017)
PB  - Atlantis Press
SN  - 2352-5398
UR  - https://doi.org/10.2991/essaeme-17.2017.458
DO  - 10.2991/essaeme-17.2017.458
ID  - Dang2017/07
ER  -