Study on trade-off of time-cost-quality in construction project based on BIM
- DOI
- 10.2991/essaeme-15.2015.184How to use a DOI?
- Keywords
- Building information modeling; Construction project; Time-cost-quality trade-off optimization; Genetic algorithm.
- Abstract
With the development of BIM technology, BIM provides a new direction for the project management of three objectives. Based on the current situation of the project time cost-optimized mass balance studies, pointing out the implementation mechanism of achieving the trade-off of time-cost-quality in construction project based on BIM mainly oriented components of the BIM model based; the use of Structured Query Language query statistics data information needs combined bill of quantities calculation method for the specification, preliminary engineering scale generation; establishment of Project relations system model. In the process duration is subject, for the construction of uncertainty factors such as interest rates and prices, through the establishment of quality, cost and schedule function, the establishment of quality balanced schedule cost optimization model, using genetic algorithm model of the optimal solution are obtained. With BIM case finally proves the rationality of the model and the effectiveness of the proposed genetic.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yongge Xu AU - Ya Wei PY - 2015/10 DA - 2015/10 TI - Study on trade-off of time-cost-quality in construction project based on BIM BT - Proceedings of the 2015 International Conference on Economics, Social Science, Arts, Education and Management Engineering PB - Atlantis Press SP - 864 EP - 870 SN - 2352-5398 UR - https://doi.org/10.2991/essaeme-15.2015.184 DO - 10.2991/essaeme-15.2015.184 ID - Xu2015/10 ER -