Analysis of Factors of Construction Contract Transaction Cost Based on ISM Model*
Authors
Hua Liu, Yaoyao Wang
Corresponding Author
Hua Liu
Available Online October 2015.
- DOI
- 10.2991/essaeme-15.2015.183How to use a DOI?
- Keywords
- Construction contract;transaction cost;Interpretive structural modeling method
- Abstract
Based on ISM (Interpretative Structural Modeling) method, this paper stand in the perspective of construction enterprises,made a structured analysis on factors that affects the large-scale project construction contract transaction costs,and set up a clear hierarchy-structuring relation system.The results indicated that, in the construction contract transaction cost control should be use the contract cost-income ratio as the evaluation criterion, the other factors are controlled to improve the efficiency of the transaction.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Hua Liu AU - Yaoyao Wang PY - 2015/10 DA - 2015/10 TI - Analysis of Factors of Construction Contract Transaction Cost Based on ISM Model* BT - Proceedings of the 2015 International Conference on Economics, Social Science, Arts, Education and Management Engineering PB - Atlantis Press SP - 859 EP - 863 SN - 2352-5398 UR - https://doi.org/10.2991/essaeme-15.2015.183 DO - 10.2991/essaeme-15.2015.183 ID - Liu2015/10 ER -