Proceedings of the 2024 3rd International Conference on Engineering Management and Information Science (EMIS 2024)

Research on risk prediction of subway shield construction based on triangular fuzzy function-entropy weight method

Authors
Wei Wang1, *, Kejian Shang1
1School of Business Administration, Liaoning Technical University, Huludao, 125105, China
*Corresponding author. Email: 1286044595@qq.com
Corresponding Author
Wei Wang
Available Online 14 July 2024.
DOI
10.2991/978-94-6463-447-1_4How to use a DOI?
Keywords
The subway; Shield construction; Risk early warning; FMEA; Triangle fuzzy function-entropy method
Abstract

Shield construction of subway tunnel is located in underground closed operation, and the frequent occurrence of safety accidents will lead to the loss of personnel safety and project benefits. This paper determines the quantitative index and weight based on the triangular fuzzy function-entropy weight method, and combines the potential failure mode and effects analysis (FMEA) method to identify and evaluate the shield construction risk from the perspective of the shield construction unit. Combined with the case, the model is verified to be operable and effective. The model constructed in this paper can be embedded in various subway tunnel shield construction, and provide risk warning support for on-site construction.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2024 3rd International Conference on Engineering Management and Information Science (EMIS 2024)
Series
Advances in Computer Science Research
Publication Date
14 July 2024
ISBN
978-94-6463-447-1
ISSN
2352-538X
DOI
10.2991/978-94-6463-447-1_4How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Wei Wang
AU  - Kejian Shang
PY  - 2024
DA  - 2024/07/14
TI  - Research on risk prediction of subway shield construction based on triangular fuzzy function-entropy weight method
BT  - Proceedings of the 2024 3rd International Conference on Engineering Management and Information Science (EMIS 2024)
PB  - Atlantis Press
SP  - 25
EP  - 35
SN  - 2352-538X
UR  - https://doi.org/10.2991/978-94-6463-447-1_4
DO  - 10.2991/978-94-6463-447-1_4
ID  - Wang2024
ER  -