High Geostress Active Fault Zones Geology Tunnel Construction Deformation Monitoring Technology Research
- DOI
- 10.2991/emim-16.2016.257How to use a DOI?
- Keywords
- The high in-situ stress; Deformation monitoring; Advance ductile.
- Abstract
Grew up in deep buried tunnels are often encounter many unfavorable geological conditions, construction of sichuan songpan project is located in the southern section of minjiang river faulting footwall tunnel on the right side, through the debris flow, landslide and soft rock large deformation DeZhiDai high in-situ stress. By optimizing the project activity fault zone of deformation monitoring in weak rock tunnel, tunnel hole body application advance small duct grouting support; Excavation steps method is used to add temporary inverted arch construction, arch combined hollow bolt, sidewall type bonding mortar anchor, such as the construction process, to effectively control deformation. Provide certain guidance and reference for the similar engineering construction.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yongmei Liu PY - 2016/04 DA - 2016/04 TI - High Geostress Active Fault Zones Geology Tunnel Construction Deformation Monitoring Technology Research BT - Proceedings of the 6th International Conference on Electronic, Mechanical, Information and Management Society PB - Atlantis Press SP - 1257 EP - 1262 SN - 2352-538X UR - https://doi.org/10.2991/emim-16.2016.257 DO - 10.2991/emim-16.2016.257 ID - Liu2016/04 ER -