Proceedings of the 2024 7th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2024)

Research on Influencing Factors and Control Measures of Power Transmission Project Construction Progress

Authors
Sen Kong1, *, Rui Liang1, Chao Dong1, Yongtan Chen1
1China Electric Power Research Institute, Beijing, 102401, China
*Corresponding author. Email: kongsen1218@163.com
Corresponding Author
Sen Kong
Available Online 31 January 2025.
DOI
10.2991/978-94-6463-650-5_23How to use a DOI?
Keywords
power transmission project; construction progress; risk factors; analytic hierarchy process; fuzzy comprehensive analysis method; policies and regulations
Abstract

The construction of power transmission project has the characteristics of many points, long line, wide area, high cost and large investment, which also leads to many risk factors faced by power transmission and transformation construction, especially the risk factors of construction progress. Through the analytic hierarchy process, the factors affecting the construction progress are identified, and the fuzzy comprehensive analysis method is used to evaluate the risk. Based on the principle of maximum membership degree and objective reality, the overall progress risk of the power transmission project construction system is generally moderate, with policies and regulations being the biggest influencing factors. It is necessary to strengthen policy interpretation, intervene in advance, make scientific judgments, reserve appropriate margins, and actively communicate and coordinate with local companies and governments during the implementation process.

Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2024 7th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2024)
Series
Advances in Engineering Research
Publication Date
31 January 2025
ISBN
978-94-6463-650-5
ISSN
2352-5401
DOI
10.2991/978-94-6463-650-5_23How to use a DOI?
Copyright
© 2025 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Sen Kong
AU  - Rui Liang
AU  - Chao Dong
AU  - Yongtan Chen
PY  - 2025
DA  - 2025/01/31
TI  - Research on Influencing Factors and Control Measures of Power Transmission Project Construction Progress
BT  - Proceedings of the 2024 7th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2024)
PB  - Atlantis Press
SP  - 223
EP  - 232
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-650-5_23
DO  - 10.2991/978-94-6463-650-5_23
ID  - Kong2025
ER  -