Proceedings of the 2nd Borobudur International Symposium on Science and Technology (BIS-STE 2020)

Identification of Precast Box Girder Erection Activities to Develop Work Breakdown Structure in Elevated Railway Infrastructure Project

Authors
Nina Purwanti, Pungky Dharma Saputra, Muhammad Hamzah Fansuri, Anasya Arsita Laksmi
Corresponding Author
Nina Purwanti
Available Online 11 August 2021.
DOI
10.2991/aer.k.210810.046How to use a DOI?
Keywords
Activities, Box Girder, Erection, Work Breakdown Structure, Railway, Infrastructure
Abstract

The railway infrastructure development is being a concern to the government of Indonesia nowadays. One of construction methods mostly applied in building the railway infrastructure is box girder erection with launching gantry. After observing several big projects with this construction method, some problems are identified. One of the problems is different work activities conducted during box girder erection. According to this situation, this research was conducted to identify precast box girder erection activities to develop work breakdown structure. The Work Breakdown Structure (WBS) will enhance the efficiency and effectivity of similar projects in the future. To conduct the analysis, there are three steps to be executed. They are archive analysis, expert judgement and surveys. For archive analysis, two big projects are observed and compared. Secondly, the judgements are obtained from five experts who have fulfilled more than ten years working experiences especially in public infrastructure construction. Thirdly, the direct surveys were held to thirty elected respondents regarding this topic. Finally, the descriptive analysis was applied to draw the result. This research conveys the WBS which has been developed according to aforementioned analysis method. There are 13 identified activities. They are preparation, box girder transportation, box girder lifting, position setting, epoxy gluing, temporary PT bar stressing, alignment surveying, PC stand and accessories installment, permanent stressing, patching, grouting and bearing installation re-surveying. This WBS is necessary to be used as a reference standard for future similar projects.

Copyright
© 2021, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2nd Borobudur International Symposium on Science and Technology (BIS-STE 2020)
Series
Advances in Engineering Research
Publication Date
11 August 2021
ISBN
978-94-6239-416-2
ISSN
2352-5401
DOI
10.2991/aer.k.210810.046How to use a DOI?
Copyright
© 2021, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Nina Purwanti
AU  - Pungky Dharma Saputra
AU  - Muhammad Hamzah Fansuri
AU  - Anasya Arsita Laksmi
PY  - 2021
DA  - 2021/08/11
TI  - Identification of Precast Box Girder Erection Activities to Develop Work Breakdown Structure in Elevated Railway Infrastructure Project
BT  - Proceedings of the 2nd Borobudur International Symposium on Science and Technology (BIS-STE 2020)
PB  - Atlantis Press
SP  - 271
EP  - 275
SN  - 2352-5401
UR  - https://doi.org/10.2991/aer.k.210810.046
DO  - 10.2991/aer.k.210810.046
ID  - Purwanti2021