Identification of Precast Box Girder Erection Activities to Develop Work Breakdown Structure in Elevated Railway Infrastructure Project
- DOI
- 10.2991/aer.k.210810.046How to use a DOI?
- Keywords
- Activities, Box Girder, Erection, Work Breakdown Structure, Railway, Infrastructure
- Abstract
The railway infrastructure development is being a concern to the government of Indonesia nowadays. One of construction methods mostly applied in building the railway infrastructure is box girder erection with launching gantry. After observing several big projects with this construction method, some problems are identified. One of the problems is different work activities conducted during box girder erection. According to this situation, this research was conducted to identify precast box girder erection activities to develop work breakdown structure. The Work Breakdown Structure (WBS) will enhance the efficiency and effectivity of similar projects in the future. To conduct the analysis, there are three steps to be executed. They are archive analysis, expert judgement and surveys. For archive analysis, two big projects are observed and compared. Secondly, the judgements are obtained from five experts who have fulfilled more than ten years working experiences especially in public infrastructure construction. Thirdly, the direct surveys were held to thirty elected respondents regarding this topic. Finally, the descriptive analysis was applied to draw the result. This research conveys the WBS which has been developed according to aforementioned analysis method. There are 13 identified activities. They are preparation, box girder transportation, box girder lifting, position setting, epoxy gluing, temporary PT bar stressing, alignment surveying, PC stand and accessories installment, permanent stressing, patching, grouting and bearing installation re-surveying. This WBS is necessary to be used as a reference standard for future similar projects.
- Copyright
- © 2021, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Nina Purwanti AU - Pungky Dharma Saputra AU - Muhammad Hamzah Fansuri AU - Anasya Arsita Laksmi PY - 2021 DA - 2021/08/11 TI - Identification of Precast Box Girder Erection Activities to Develop Work Breakdown Structure in Elevated Railway Infrastructure Project BT - Proceedings of the 2nd Borobudur International Symposium on Science and Technology (BIS-STE 2020) PB - Atlantis Press SP - 271 EP - 275 SN - 2352-5401 UR - https://doi.org/10.2991/aer.k.210810.046 DO - 10.2991/aer.k.210810.046 ID - Purwanti2021 ER -