The Scheduling of quay cranes and truck in Container Port——A Simulation-based method
Authors
Huijuan Ma, Yongfa Hong, Yuyue Du
Corresponding Author
Huijuan Ma
Available Online May 2015.
- DOI
- 10.2991/asei-15.2015.165How to use a DOI?
- Keywords
- Container Port, FlexTerm, (un)Loading Pattern, Truck Scheduling
- Abstract
In order to study the Scheduling of quay cranes and tractor in container port, this paper establishes the simulation model of container port’s (un)loading operation by use of container port’s simulation software FlexTerm. The mixed loading operation and independent (un)loading operation in different quantities of Trucks are simulated. The accomplished time of mission, crane utilization and truck travel distance in two different loading operation modes are compared. According to the simulation result, some suggestions on allocation of truck and (un)loading pattern are provided.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Huijuan Ma AU - Yongfa Hong AU - Yuyue Du PY - 2015/05 DA - 2015/05 TI - The Scheduling of quay cranes and truck in Container Port——A Simulation-based method BT - Proceedings of the 2015 International conference on Applied Science and Engineering Innovation PB - Atlantis Press SP - 842 EP - 847 SN - 2352-5401 UR - https://doi.org/10.2991/asei-15.2015.165 DO - 10.2991/asei-15.2015.165 ID - Ma2015/05 ER -