Layout Analysis And Optimization Of Assembly Workshop Of Bogie
Authors
Lei Tang, Li Sun, Jiang Wei
Corresponding Author
Lei Tang
Available Online May 2016.
- DOI
- 10.2991/wartia-16.2016.140How to use a DOI?
- Keywords
- bogie, layout analysis, simulation, em-plant.
- Abstract
with the fast rapid development of high-speed railway and heavy haul, the company of a locomotive bogie assembly line production capacity and production efficiency needs to be improved. In order to improve the production efficiency of the assembly workshop of the bogie and improve annual output and save the cost, the present paper makes an investigation and Analysis on the present situation of the workshop layout. Using the simulation software em-Plant to build the simulation model to analyze the data, provides reliable basis for further optimization of the parameters of the layout.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Lei Tang AU - Li Sun AU - Jiang Wei PY - 2016/05 DA - 2016/05 TI - Layout Analysis And Optimization Of Assembly Workshop Of Bogie BT - Proceedings of the 2016 2nd Workshop on Advanced Research and Technology in Industry Applications PB - Atlantis Press SP - 675 EP - 679 SN - 2352-5401 UR - https://doi.org/10.2991/wartia-16.2016.140 DO - 10.2991/wartia-16.2016.140 ID - Tang2016/05 ER -