Proceedings of the 10th Annual Meeting of Risk Analysis Council of China Association for Disaster Prevention (RAC 2022)

Reserach on Risk Factors of Water Conservancy Project Requisition and Resettlement Based on PCA

Authors
Jianan Liu1, *, Qian Wu1, Jinshui Jin2
1School of Civil Engineering, Xi’an University of Architecture and Technology, Xi’an, China
2Shaanxi Chenghe Water convervancy project Consulting Mangement Co.LTD, Xi’an, China
*Corresponding author. Email: 13679265720@163.com
Corresponding Author
Jianan Liu
Available Online 21 July 2023.
DOI
10.2991/978-94-6463-194-4_40How to use a DOI?
Keywords
water conservancy project; requisition and resettlement; principal component analysis; risk assessment
Abstract

Because of the water conservancy project construction period is long, large quantities, wide-ranging, this article selects a shaanxi province III reservoirs, such as moving in prior to the construction of the project of resettlement,. The application of SPSS software, using principal component analysis (pca) to move in) placed in the various risk factors were analyzed, and the main risk factors in the process of resettlement, and the analysis: the character move the resettlement work, instability The highest factors are factors involving personal interests, such as resettlement, resettlement scheme, implementation of expropriation and compensation, and compensation fund standard. In future water conservancy projects, we can pay more attention to such risk factors to reduce the social stability risk of project construction, and provide a solid foundation for the resettlement of expropriation and relocation.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 10th Annual Meeting of Risk Analysis Council of China Association for Disaster Prevention (RAC 2022)
Series
Advances in Economics, Business and Management Research
Publication Date
21 July 2023
ISBN
978-94-6463-194-4
ISSN
2352-5428
DOI
10.2991/978-94-6463-194-4_40How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Jianan Liu
AU  - Qian Wu
AU  - Jinshui Jin
PY  - 2023
DA  - 2023/07/21
TI  - Reserach on Risk Factors of Water Conservancy Project Requisition and Resettlement Based on PCA
BT  - Proceedings of the 10th Annual Meeting of Risk Analysis Council of China Association for Disaster Prevention (RAC 2022)
PB  - Atlantis Press
SP  - 284
EP  - 288
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-194-4_40
DO  - 10.2991/978-94-6463-194-4_40
ID  - Liu2023
ER  -