Rapid Testing Method of New Generation Smart Substation Network Configuration
Authors
Wang Lei, Li Jin
Corresponding Author
Wang Lei
Available Online December 2015.
- DOI
- 10.2991/nceece-15.2016.69How to use a DOI?
- Keywords
- New Generation Smart Substation; Network Configuration; Testing
- Abstract
A number of popular communication traffic control protocols including virtual local area network and GMRP are applied in the new generation Smart Substation internal communication network. This paper presents a black-box testing method which does not rely on specific network configuration profile that can hopefully simplify testing requirements, and to meet the demands of smart substation operation and maintenance.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Wang Lei AU - Li Jin PY - 2015/12 DA - 2015/12 TI - Rapid Testing Method of New Generation Smart Substation Network Configuration BT - Proceedings of the 2015 4th National Conference on Electrical, Electronics and Computer Engineering PB - Atlantis Press SP - 349 EP - 353 SN - 2352-5401 UR - https://doi.org/10.2991/nceece-15.2016.69 DO - 10.2991/nceece-15.2016.69 ID - Lei2015/12 ER -