A Model for Replacing the Kaliba Dam Based on Multi-dam System
- DOI
- 10.2991/msmee-17.2017.142How to use a DOI?
- Keywords
- Kariba Dam; A system of dams;0-1 Integer Programming;
- Abstract
Considering the Kariba Dam's current dangerous situation, our team primarily analyses the three available options, and then explores the effect from a system of dams to the Zambezi River.a Dam Site Selection Model(DSSM)is established by constructing two initial sub-models named Basic Location Model (BLM) and Optimized Addressing Model (OAM) respectively. In BLM, based on the principle of building dams at densely packed contours, we get a series of contour by Global Mapper and determine 25 original locations .In OAM, based on overall water management capabilities which framed by reservoir capacity and Dam Cost Equation which founded by Dam Geometries Equation, the position of the dam is a variable, by 0-1 Integer Programming , our team acquire the position coordinates of 15 dams.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yajie Xu PY - 2017/05 DA - 2017/05 TI - A Model for Replacing the Kaliba Dam Based on Multi-dam System BT - Proceedings of the 2017 2nd International Conference on Materials Science, Machinery and Energy Engineering (MSMEE 2017) PB - Atlantis Press SP - 731 EP - 735 SN - 2352-5401 UR - https://doi.org/10.2991/msmee-17.2017.142 DO - 10.2991/msmee-17.2017.142 ID - Xu2017/05 ER -