The risk sharing of client request error terms in DB mode
- DOI
- 10.2991/msie-16.2016.138How to use a DOI?
- Keywords
- Client requirement; B terms; Engineering change
- Abstract
The DB general contractor needs to be done according to client requirement design of part or all of the work, the developer in the preliminary design stage tender, general mainly provide relevant conceptual, basic requirements of the project, which unavoidably exist errors and biases. As for the request is not clear, the design information is not complete, time nervous cause design accuracy is not enough. If the employer in the bidding and construction drawing design stage, while the developer provides a relatively detailed design documents, but there still may be inevitable errors. The developer because of subjective or objective error causes of client request, may cause delays due to design changes and changes to problems such as the price dispute, engineering change agreement is not clear lead to change the understanding of both parties after the occurrence of deviation, change the controversy, the key to solve the dispute of engineering change is to clarify what kind of work does fall within the scope of engineering change adjustment.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Shan Zhou AU - Saoyan Wu PY - 2016/10 DA - 2016/10 TI - The risk sharing of client request error terms in DB mode BT - Proceedings of the 2016 International Conference on Management Science and Innovative Education PB - Atlantis Press SP - 634 EP - 641 SN - 2352-5398 UR - https://doi.org/10.2991/msie-16.2016.138 DO - 10.2991/msie-16.2016.138 ID - Zhou2016/10 ER -