Impact of due dates for complex product engineering change based on capability constraints
Authors
HuaiGuo Zhang, Xiang Su, ZhiYing Wang
Corresponding Author
HuaiGuo Zhang
Available Online December 2017.
- DOI
- 10.2991/mshsd-17.2018.3How to use a DOI?
- Keywords
- complex product, engineering change, due dates, capacity constraints
- Abstract
It is difficult to establish the delivery date during complex product engineering change, a model of the effect of delivery date based on capacity constraints was proposed. Firstly, capacity requirements plannings were set up according to the critical process of change parts manufacturing and the corresponding critical resources, and the critical resource load rate was calculated for evaluating load of resources categories. Then, using adjusted network diagram analyzes product delivery date change. Finally, a case study of complex product engineering changes was provided to validate the feasibility of the proposed method.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - HuaiGuo Zhang AU - Xiang Su AU - ZhiYing Wang PY - 2017/12 DA - 2017/12 TI - Impact of due dates for complex product engineering change based on capability constraints BT - Proceedings of the 2017 World Conference on Management Science and Human Social Development (MSHSD 2017) PB - Atlantis Press SP - 11 EP - 17 SN - 2352-5398 UR - https://doi.org/10.2991/mshsd-17.2018.3 DO - 10.2991/mshsd-17.2018.3 ID - Zhang2017/12 ER -