On Several Supervision and Control Measures to Improve the Quality of Equipment Installation in Substation
- DOI
- 10.2991/msetasse-16.2016.373How to use a DOI?
- Keywords
- Substation Equipment Installation; Quality Control; Supervision Card; Standard Process; Drawings
- Abstract
Xinjiang Electric Power Engineering Supervision Co., Ltd. (referred to as the company) from the supervision of quality control and quality control, explore the application of standardized supervision card, flexible use of drawings, equipment out of the box, the standard process inspection and other means of control and to further improve the ex ante, in the matter, after the supervision process quality control system, to strengthen the quality control of the main equipment in the substation installation process. The company through the application in Xinjiang three Santanghu 750 thousand volt substation, jijihu 750 thousand volt substation in engineering construction. It has effectively reduced the quality defects of the main equipment in the 750 thousand volt substation at the same time, and played a positive role in improving the quality of the field.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Pengfei Yin AU - Bangyuan Huang AU - Kai Tang PY - 2016/11 DA - 2016/11 TI - On Several Supervision and Control Measures to Improve the Quality of Equipment Installation in Substation BT - Proceedings of the 2016 4th International Conference on Management Science, Education Technology, Arts, Social Science and Economics (msetasse-16) PB - Atlantis Press SP - 1732 EP - 1736 SN - 2352-5398 UR - https://doi.org/10.2991/msetasse-16.2016.373 DO - 10.2991/msetasse-16.2016.373 ID - Yin2016/11 ER -