Simulation and Optimization of Plant Production Takt
Authors
Guangzhen Li, Zhigang Xu, Zhaohui Ren
Corresponding Author
Guangzhen Li
Available Online August 2019.
- DOI
- 10.2991/msbda-19.2019.16How to use a DOI?
- Keywords
- Optimization, Plant simulation, Production takt, Discrete-event
- Abstract
In order to solve the problem of planning and optimizing the production takt of a key link in the rocket assembly workshop. The production takt is obtained through the modeling and Simulation analysis of the actual plant based on the Plant Simulation, a professional discrete Simulation software. The factors that affect the production takt are obtained qualitatively and the influences of these factors are quantified, and the configuration of these factors is finally determined through the DOE experiment method to make the production takt reach the practical optimal and the theoretical optimal.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Guangzhen Li AU - Zhigang Xu AU - Zhaohui Ren PY - 2019/08 DA - 2019/08 TI - Simulation and Optimization of Plant Production Takt BT - Proceedings of the 2019 International Conference on Modeling, Simulation and Big Data Analysis (MSBDA 2019) PB - Atlantis Press SP - 98 EP - 103 SN - 2352-538X UR - https://doi.org/10.2991/msbda-19.2019.16 DO - 10.2991/msbda-19.2019.16 ID - Li2019/08 ER -