Determination for mine construction project time and its parameters using network planning technique
- DOI
- 10.2991/mmebc-16.2016.440How to use a DOI?
- Keywords
- Mine Construction; Project Time; Parameters; Network Planning Technique;
- Abstract
Mine construction is a large complex engineering projects, it include a large number of roadway engineering in underground, the ground construction and a large number of electrical mechanical equipment installation engineering, These engineering projects restrict each other and contact with each other, how to organize the most reasonable construction, To achieve the comprehensive planning, unified arrangement, and how to complete the task economically, to solve this problem, network technology provides scientific methods and effective way. In this paper, authors compile a mine construction organization design general program using network planning technique, The program input data is concise, easy to operate, it can be used to analyze complex network problem, and to solve production actual problem effectively and practically, it can be easily used to determine construction period and the process parameters and the key lines, It has been successfully used for Chengzhuang coal mine construction project network organization diagram, that can be regarded as a kind of scientific and practical method.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Fengshan Han AU - Xinli Wu PY - 2016/06 DA - 2016/06 TI - Determination for mine construction project time and its parameters using network planning technique BT - Proceedings of the 2016 6th International Conference on Machinery, Materials, Environment, Biotechnology and Computer PB - Atlantis Press SP - 2198 EP - 2202 SN - 2352-5401 UR - https://doi.org/10.2991/mmebc-16.2016.440 DO - 10.2991/mmebc-16.2016.440 ID - Han2016/06 ER -