To solve the problem of transporting the slime and gangue which in the power plant at the long-distance, and improving the economic and environmental benefits, it plans to design the pipeline of slime and gangue. Under the premise of the feasibility, begin to implement and manage the transportation method of the pipeline. This paper describes the transportation methods and research status about slime and gangue, such as traditional or existing transport planning scheme. Comparing these programs to choose the best method under the guidance of maximize benefits, in order to solve the problem of material transportation from Suncun mine to the power plant. It provides an effective way to solve the issues of slime utilization and environmental protection and creates enormous social and economic benefits in the coal industry. Thus build coal - electricity - Fine coal industry chain, to promote the rapid development of new coal-fired power industry
- Copyright
- © 2014, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xinghua Li AU - Danying Wang PY - 2014/10 DA - 2014/10 TI - The transport systems of simulation and optimization of Dingfeng’s slime and gangue power plant BT - Proceedings of the Taishan Academic Forum – Project on Mine Disaster Prevention and Control PB - Atlantis Press SP - 405 EP - 416 SN - 2352-5401 UR - https://doi.org/10.2991/mining-14.2014.60 DO - 10.2991/mining-14.2014.60 ID - Li2014/10 ER -