Research of Safety Pre-control Management System of Power Plants
Authors
Xinghua Li, Suli Wang
Corresponding Author
Xinghua Li
Available Online October 2014.
- DOI
- 10.2991/mining-14.2014.57How to use a DOI?
- Keywords
- Safety pre-control management; Hazard; Early warning
- Abstract
Carrying out safety Pre-control management can offer the power plants clear understanding and overall evaluation of hazard in the range of their productive activities, so as to avoid the hazard turning into potential safety hazard, and to nip it in the bud. On the basis of comprehensively identifying hazard, LEC is used to evaluate the hazard in this paper. According to the evaluation results, the hazard is managed in different grades. In addition, overall design of the system is provided. Forms including short message are suggested to be used, thus to make early warning for the hazard in the safety production process of power plants.
- Copyright
- © 2014, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xinghua Li AU - Suli Wang PY - 2014/10 DA - 2014/10 TI - Research of Safety Pre-control Management System of Power Plants BT - Proceedings of the Taishan Academic Forum – Project on Mine Disaster Prevention and Control PB - Atlantis Press SP - 386 EP - 390 SN - 2352-5401 UR - https://doi.org/10.2991/mining-14.2014.57 DO - 10.2991/mining-14.2014.57 ID - Li2014/10 ER -