Study on Grouting Anchor Cable Supporting Technology of Roadway through Extra Large Fault Fracture Zone
- DOI
- 10.2991/mining-14.2014.17How to use a DOI?
- Keywords
- Extra large fault fracture zone; Tectonic stress; surrounding rock deformation; Prestressed hollow grouting anchor cable
- Abstract
Fault fracture zone due to the loose and broken surrounding rock of roadway, tectonic stress, the surrounding rock deformation is hard to control, has been one of the difficulties in roadway support technology research. This paper aim at Xingcun coal mine-1196m level roadway through extra large fault fracture zone, large deformation of surrounding rock and failure supporting project, can t ensure the overall stability of the roadway, put forward the “Bolt-mesh-spurting + prestressed hollow grouting anchor” combination support, effectively control the surrounding rock deformation in the test section of roadway, successfully resolved the problem of long-term stability of the surrounding rock in the fracture zone.
- Copyright
- © 2014, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jinxiao Liu AU - Jidong Jing AU - Yiyu Feng AU - Lei Wu AU - Peisen Zhang PY - 2014/10 DA - 2014/10 TI - Study on Grouting Anchor Cable Supporting Technology of Roadway through Extra Large Fault Fracture Zone BT - Proceedings of the Taishan Academic Forum – Project on Mine Disaster Prevention and Control PB - Atlantis Press SP - 114 EP - 118 SN - 2352-5401 UR - https://doi.org/10.2991/mining-14.2014.17 DO - 10.2991/mining-14.2014.17 ID - Liu2014/10 ER -