Study on Selection of Turbine Design and Sizing of Transmission Cable for Development of Pico HydroPower Plant at Dewi Bukit Mangggung Tourism Place Tanjungsiang, Subang, West Java
- DOI
- 10.2991/978-94-6463-134-0_55How to use a DOI?
- Keywords
- Micro Hydro; Pico Hydro; Turbine design
- Abstract
Follow up on the collaboration between the Research Center for Appropriate Technology National Research and Innovation Agency with PT. Bukit Dewi Manggung, a study of the potential of micro hydro, was carried out in Rancamanggung village, Tanjung Siang sub-district, Subang district. Activities consisted of measuring the potential for water discharge, height difference, the site layout, and selecting the type of turbine suitable for the existing potential. Field measurements identified two alternative sites that could be developed. The first location had a head of 3 m, and the second location was 6 m. The flow rate was 0.51 ± 0.23 m3 per second. The analysis showed that the turbine type suitable for use at both potential locations was cross-flow. The diameter of the turbine runner for both 3m and 6m heads was 269 mm, while the width of them was 1108 mm and 630 mm, respectively. The size of the cable used in the pico hydro plant, which had a head of 3 m and 6 m, was 16 mm2 and 40 mm2, respectively, with power losses of 1239 W and 1983 W, respectively.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Dadang Dayat Hidayat AU - Maulana Furqon AU - Ari Rahayuningtyas AU - Umi Hanifah AU - Teguh Santoso PY - 2023 DA - 2023/04/19 TI - Study on Selection of Turbine Design and Sizing of Transmission Cable for Development of Pico HydroPower Plant at Dewi Bukit Mangggung Tourism Place Tanjungsiang, Subang, West Java BT - Proceedings of the 6th Mechanical Engineering, Science and Technology International conference (MEST 2022) PB - Atlantis Press SP - 579 EP - 589 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-134-0_55 DO - 10.2991/978-94-6463-134-0_55 ID - Hidayat2023 ER -