Abstract

For below 35 kv power line construction characteristics and difficulties are analyzed, according to the statistics, below 35 kv power line tripping accidents occurred frequently, therefore, proposes a below 35 kv power line and distribution substation construction scheme. To analyze the key technology of transmission lines construction and optimization, to avoid the lightning strike again, mix and match of tripping occur under the influence, on the key technology of transformer substation construction to fastidious, used to be perfect. In order to verify the proposed below 35 kv power line and the validity of substation construction scheme, simulation test was designed, through the experiment proves that the proposed below 35 kv power line and the validity of substation construction scheme.

Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 7th International Conference on Management, Education, Information and Control (MEICI 2017)
Series
Advances in Intelligent Systems Research
Publication Date
October 2017
ISBN
978-94-6252-412-5
ISSN
1951-6851
DOI
10.2991/meici-17.2017.176How to use a DOI?
Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Zhaofa Sun
AU  - Hongrun Sun
PY  - 2017/10
DA  - 2017/10
TI  - Power Lines and Distribution Substation Construction under 35KV
BT  - Proceedings of the 7th International Conference on Management, Education, Information and Control (MEICI 2017)
PB  - Atlantis Press
SP  - 886
EP  - 891
SN  - 1951-6851
UR  - https://doi.org/10.2991/meici-17.2017.176
DO  - 10.2991/meici-17.2017.176
ID  - Sun2017/10
ER  -