Experimental Study on Gas Outburst Removal by Cross-seam Holes Pre-drilling Gas Drainage in Floor Roadway
- DOI
- 10.2991/meici-17.2017.166How to use a DOI?
- Keywords
- Crossing hole; Drainage outburst elimination; Low permeability coal seam; Bottom lane; Coal lane strip
- Abstract
Because of China's coal mine gas disaster is serious, for a single outburst low permeability coal seam,pre-drilling gas drainage by cross-seam holes is the main means  to solving the gas disaster . Aiming at the problem of the coal roadway strip and the working face outburst removal, the experimental study on cross-seam holes pre-drilling gas drainage in floor roadway. The evolution law of gas pressure along with the extraction time is analyzed, the key parameters of the best extraction efficiency are obtained. The experiment was carried out in the test mine, The research shows that cross-seam holes pre-drilling gas drainage in floor roadway effectively solve the outburst problems without protective layer mining and single coal seam, and achieved remarkable results, the coal roadway safety belt tunneling and mining face, which plays an important role.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Peng Zhang AU - Yongjiang Zhang PY - 2017/10 DA - 2017/10 TI - Experimental Study on Gas Outburst Removal by Cross-seam Holes Pre-drilling Gas Drainage in Floor Roadway BT - Proceedings of the 7th International Conference on Management, Education, Information and Control (MEICI 2017) PB - Atlantis Press SP - 836 EP - 840 SN - 1951-6851 UR - https://doi.org/10.2991/meici-17.2017.166 DO - 10.2991/meici-17.2017.166 ID - Zhang2017/10 ER -