Improved Incremental Launching Method for Steel Box Girder
- DOI
- 10.2991/lemcs-14.2014.252How to use a DOI?
- Keywords
- incremental launching method; steel box girder without upper plate; ABAQUS; post buckling
- Abstract
During the traditional incremental launching method for steel box girder, high-performance launching equipment, more accuracy and stronger temporary piers are needed because of the exaggerated gravity caused by upper plate, which leads to the cost increasing. It can even cause damages at the support points due to the enormous gravity for the thin wall steel box girder. In order to prevent above failure, an improved incremental launching method is proposed for steel box girder. Five pushing cases, stresses distribution, buckling at the mid-span and so on are analyzed by software ABAQUS. The result shows that this improvement method can meet the requirement of incremental launching construction; the deformation and stress in the pushing process meet the requirement.
- Copyright
- © 2014, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Wu Hongsheng AU - Zou Yu AU - Li Yanming AU - Ma Junming AU - Wang Haijun PY - 2014/05 DA - 2014/05 TI - Improved Incremental Launching Method for Steel Box Girder BT - Proceedings of the International Conference on Logistics, Engineering, Management and Computer Science PB - Atlantis Press SP - 1127 EP - 1131 SN - 1951-6851 UR - https://doi.org/10.2991/lemcs-14.2014.252 DO - 10.2991/lemcs-14.2014.252 ID - Hongsheng2014/05 ER -