Research on the Large Steel Cofferdam Floating Scheme
- DOI
- 10.2991/lemcs-14.2014.53How to use a DOI?
- Keywords
- steel cofferdam; formation; floating scheme; navigation environment; towing
- Abstract
Steel cofferdam is essential for the construction of the large bridge, which is featured by its huge volume and heavy weight. When steel cofferdam has been built in the shipyard, it would be transit to the bridge construction site by way of waterway. Owing to its no-powered self-propelled, it should be towed through tugboat. Based on the transition of the steel cofferdam for the east Yangtze River Bridge, we propose the floating scheme for the transportation of gigantic steel cofferdam. Our studies are conducting systematically from the floating formation scheme while the navigational environments are taken into account. Within our research, the safe and effective floating transition scheme is devised scientifically. The effectiveness of our steel cofferdam transition scheme is verified by the production instance.
- Copyright
- © 2014, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yusheng Wang AU - Yong Ma PY - 2014/05 DA - 2014/05 TI - Research on the Large Steel Cofferdam Floating Scheme BT - Proceedings of the International Conference on Logistics, Engineering, Management and Computer Science PB - Atlantis Press SP - 229 EP - 233 SN - 1951-6851 UR - https://doi.org/10.2991/lemcs-14.2014.53 DO - 10.2991/lemcs-14.2014.53 ID - Wang2014/05 ER -